HOLIDAY - DÍA FERIADO In observance of Martin Luther King Jr. Day, our offices and call centers will be closed on Monday, January 20, 2025. Regular business hours will resume on Tuesday, January 21 at 8:30 a.m.En conmemoración del Día de Martin Luther King, Jr., nuestras oficinas y centros de llamada estarán cerrados el lunes, 20 de enero de 2025. El horario laboral regular se reanudará el martes, 21 de enero a las 8:30 am.
RI Recycled Metals (Former Boliden) Document Description Date Superior Court Order - Interim Measures New 1/10/2025 Interim Site Controls - Stockpile Mgmt 12/30/2024 Superior Court Decision - Receivership New 12/13/2024 Public Meeting #2 - Handouts & Slides 12/4/2024 Response to Public Comments 11/26/2024 Public Notification & Comment Period Extension 11/21/2024 Public Notice - PIP Public Meeting #2 11/15/2024 Post-SIR Public Notice (Remedial Alternative) 11/1/2024 Meeting Summary - PIP Public Meeting, Aug. 6, 2024 10/18/2024 Program Letter 10/8/2024 PIP Public Comments & Meeting 10/4/2024 Remedial Design Comment Response 2 9/20/2024 Remedial Design Comment Letter Clarification 9/11/2024 RIDEM Email - Status of PIP Public Meeting Summary 9/9/2024 Response Email - Status of PIP Public Meeting Summary 9/9/2024 Remedial Design Comment Response 8/29/2024 Remedial Design Comment Letter 8/23/2024 Report & Recommendation regarding Fire Safety (Court Filing) New 8/6/2024 Public Notice - PIP Public Meeting 7/12/2024 Focused Compliance Inspection Report 7/12/2024 RIRM Response to Remedy Comments 7/11/2024 Conceptual Remedy Comments 6/20/2024 SIR Addendum - Post-Fire Sampling 6/17/2024 Post-Fire Sampling & PIP Public Mtg. Deadline 6/11/2024 Meeting Summary for May 9, 2024 5/21/2024 Post-Fire Sampling & PIP Public Mtg ext. 5/17/2024 Post-Fire Sampling & PIP Public Mtg 4/30/2024 Post-Fire Sampling Required - Letter 4/22/2024 RIRM Proposed Conceptual Remedy 4/1/2024 Updated Analytical Report w. TCLP (1 of 2) 3/11/2024 Updated Analytical Report w. TCLP (2 of 2) 3/11/2024 Follow-Up Feb. 22, 2024 Meeting - Letter 2/29/2024 Final DRAFT PIP for Comment 2/23/2024 RIDEM Response to RIRM Draft PIP v2.0 2/5/2024 RIDEM Response to LSE Comment Responses 2/2/2024 RIRM Response to Comments on PIP Draft 1.0 2/1/2024 Draft PIP version 2.0 2/1/2024 RIRM Response to RIDEM SIR Comments 1/12/2024 Draft Public Involvement Plan (PIP) 12/28/2023 SIR Comment Letter 12/27/2023 Site Investigation Report (SIR) 12/12/2023 Public Involvement Plan (PIP) Initiation Letter 11/16/2023 Petition for Public Involvement Plan for RIRM 11/14/2023 Status Report Memo for Oct. 31 - Nov. 10, 2023 11/10/2023 Status Report Memo for Sept. 6 - Oct. 19, 2023 10/20/2023 Pre-SI Notification to Abutters - English 10/17/2023 Pre-SI Notification to Abutters - Spanish 10/17/2023 SIR Sampling Plan Site Figure 10/17/2023 DEM Response to Revised SIWP 8/18/2023 Site Investigation Work Plan - Revised 8/8/2023 DEM Environmental Justice Fact Sheet - English 8/1/2023 DEM Environmental Justice Fact Sheet - Spanish 8/1/2023 Site Plat Map 7/31/2023 Clarification of SI Requirements 6/30/2023 Site Investigation Work Plan - Comment Letter 6/12/2023 SIR Work Plan 6/6/2023 RIRM Permitting Plan Set 5/16/2023 Meeting Minutes - DEM, RIDEM 3/30/2023 Phase II Subsurface Investigation Report 3/8/2016 Memo to File - Field Inspection Notes 5/20/2015 Construction Period SWPPP Site Plans - Revised December 2012 12/28/2012 Multisector General Permit SWPPP Plans - Revised December 2012 12/28/2012 RIPDES Construction General Permit SWPPP - Revised December 2012 12/28/2012 RIPDES Multisector General Permit SWPPP - Revised December 2012 12/28/2012 Construction Period SWPPP Site Plans - Revised August 2012 8/23/2012 Multisector General Permit SWPPP Plans - Revised August 2012 8/23/2012 RIPDES Construction General Permit SWPPP - Revised August 2012 8/23/2012 RIPDES Multisector General Permit SWPPP - Revised August 2012 8/23/2012 Inspection Photos 1 12/14/2011 Inspection Photos 2 12/14/2011 2011 Annual ELUR Inspection 9/26/2011 Letter of Non-Compliance 8/17/2011 Note to File 12/21/2010 CRMC Assent Application Narrative 11/1/2010 RIPDES Application Number RIR50N099 11/1/2010 Approval to Revised Cap Disturbance 10/27/2010 Request for Soil Disturbance SMP - Revised 10/25/2010 Request for Soil Disturbance Approval - Revised - 2 10/25/2010 Request for Soil Disturbance Approval - Revised 4/30/2010 Approval to Disturb Cap 3/29/2010 New Bulkhead & Improvement Dredging Project 2/10/2010 Request for Soil Disturbance Approval 1/4/2010 Response to Notice of Overdue Inspection 10/23/2007 Notice - Overdue Annual Inspection Report 10/3/2007 2006 Annual Inspection 9/7/2006 Response to NOIE by New Owner (ACR Realty) 8/25/2006 Response to NOIE by Previous Owner (Mapleville) 8/23/2006 Notice of Intent to Enforce (NOIE) 8/3/2006 2005 Annual Inspection Report 7/11/2005 2004 Annual Inspection Report 5/3/2004 EPA NFRAP Letter & SMP 2/12/2004 EPA NFRAP Letter & 1994 Quality Assurance Project Plan 2/12/2004 Letter of Compliance 3/21/2003 Cover Letter for ELUR 2/7/2003 ELUR - Recorded & Stamped 2/3/2003 Remedial Decision Letter & Remedial Approval Letter 1/16/2003 Remedial Approval Fee - Cover Letter 1/13/2003 Notification to Abutters - Comment Period 9/5/2002 Notification to Abutters of Site Investigation 8/7/2002 Letter of Responsibility, dated October 5, 1999 8/5/2002 Record of Telephone Call 11/27/2001 Draft ELUR Follow Up 11/19/2001 Discussion of Remedial Alternatives 12/26/2000 Summary of Groundwater Sampling Results 9/26/2000 Report of Analytical Results 6/26/2000 Meeting Attendance Sign-In Sheet 5/30/2000 DEM Response to January 20, 2000 Letter 5/26/2000 Soil Management Plan Notification to Abutters Letter 3/24/2000 Site Access Agreement Request 3/13/2000 Response to LOR & Draft ELUR 1/20/2000 Groundwater Sampling 1/13/2000 Certificate of Completion 8/4/1999 Report of Analytical Results 2/15/1999 Cover Letter to Cleanup Verification Report 5/4/1998 Cleanup Verification Report & Appendices A - E 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 1 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 2 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 3 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 4 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 5 of 5 5/4/1998 Cleanup Verification Report - Appendix G 5/4/1998 Cleanup Verification Report - Appendix H - Vol. 1 of 2 5/4/1998 Cleanup Verification Report - Appendix H - Vol. 2 of 2 5/4/1998 Cleanup Verification Report - Appendix I 5/4/1998 Cleanup Verification Report - Appendix J - Vol. 1 of 2 5/4/1998 Cleanup Verification Report - Appendix J - Vol. 2 of 2 5/4/1998 Cleanup Verification Report - Appendix K - Vol. 1 of 2 5/4/1998 Cleanup Verification Report - Appendix K - Vol. 2 of 2 5/4/1998 Cleanup Verification Report - Appendix L 5/4/1998 Cleanup Verification Report - Appendix M 5/4/1998 Cleanup Verification Report - Appendix N 5/4/1998 Cleanup Verification Report - Appendix O 5/4/1998 PCB Soil Disposal Confirmation 2/28/1998 Soil Analytical Results 2/26/1998 Site Remediation Project Agenda 2/23/1998 VHB Project Narrative 2/23/1998 Soil Management Work Plan - Revised 2/9/1998 Groundwater Sampling Location Plan 1/3/1998 EPA Work Plan Approval 6/27/1997 EPA Record of Verbal Comments on Work Plan 6/23/1997 Soil Management Work Plan 6/16/1997 Quantitation Report (Lab) 10/20/1996 Final Site Inspection Report (no attachments) 2/19/1993 Final Site Inspection Report - Complete 2/19/1993 Dept. Comments - Superfund Support Draft Site Inspection 1/11/1993 [Memo] Trip Report - Site Recon. & Sampling 8/7/1992 Trip Report - Site Recon. & Sampling 8/7/1992 Preliminary Assessment - Cover Letter 11/26/1990 CERCLA Letters 4/19/1988 EPA Potential Hazardous Waste Sites 2/23/1988