HOLIDAY - DÍA FERIADO In observance of Martin Luther King Jr. Day, our offices and call centers will be closed on Monday, January 20, 2025. Regular business hours will resume on Tuesday, January 21 at 8:30 a.m.En conmemoración del Día de Martin Luther King, Jr., nuestras oficinas y centros de llamada estarán cerrados el lunes, 20 de enero de 2025. El horario laboral regular se reanudará el martes, 21 de enero a las 8:30 am.
University of Rhode Island Purchasing Building Type:Permeable pavement Use: Institutional Installer: Richmond Sand and Gravel Designer/Developer: Cahill Associates and BETA Group Installation Date: 2000 Address: URI, 581 Plains Rd., Kingston, RI 02881 An emergency vehicle access road was constructed with Turfstone outside of the Univ. of Rhode Island Purchasing Building, which is located at the bottom of Flagg Road on the University of Rhode Island’s Kingston campus. The area where this access road was constructed is prone to mud formation when the top layer of soil defrosts on a cyclical basis in the spring. The University wanted to ensure a stable foundation for emergency access vehicles. According to David Bascom, Assistant Director of the Landscapes and Grounds Department at the University of Rhode Island, the Turfstone emergency access road is easy to maintain and has held up very well. Part of the emergency access road Address: 581 Plains Rd., Kingston, RI 02881