HOLIDAY - DÍA FERIADO In observance of Martin Luther King Jr. Day, our offices and call centers will be closed on Monday, January 20, 2025. Regular business hours will resume on Tuesday, January 21 at 8:30 a.m.En conmemoración del Día de Martin Luther King, Jr., nuestras oficinas y centros de llamada estarán cerrados el lunes, 20 de enero de 2025. El horario laboral regular se reanudará el martes, 21 de enero a las 8:30 am.
Sail Newport Boat Ramp Type: Permeable Pavement Use: Civic/Public Installer: East Coast Construction Designer/Developer: Gridtech Installation Date: 2008 Address: 60 Fort Adams Drive, Newport, 02840 Contact: Aurthur Erhardt President of GridTech aerhardt@gridtech.com (401) 849-7920 The articulating concrete block system is designed for stability and erosion control. The cable linked concrete blocks are laid down and gaps are filled with fractured stone which allows for drainage of stormwater flowing down the ramp. The material is capable of supporting heavier vehicles, easy to repair, requires little maintenance and is very durable. In addition to reducing pollutant loading, the material will improve stability and reduce erosion of the underlying sediment. Articulating concrete blocks filled with fractured stone Address: 60 Fort Adams Drive, Newport, 02840