HOLIDAY - DÍA FERIADO In observance of Martin Luther King Jr. Day, our offices and call centers will be closed on Monday, January 20, 2025. Regular business hours will resume on Tuesday, January 21 at 8:30 a.m.En conmemoración del Día de Martin Luther King, Jr., nuestras oficinas y centros de llamada estarán cerrados el lunes, 20 de enero de 2025. El horario laboral regular se reanudará el martes, 21 de enero a las 8:30 am.
Mount Saint Charles Academy LID Type: Bioretention Use: Institutional Installer: Catalano Construction Designer/Developer: Morris Beacon Design Install Date: 2013 Address: 800 Logee Street Town: Woonsocket Zip Code: 02895 County: Providence Contact: Jonathan Ford, PE Horsley Witten jford@horsleywitten.com 401.451.5123 Project Summary: Mt. St. Charles Academy incorporated lined and unlined bioretention systems into a new six court tennis complex across from their main campus. The bioretention areas filter and infiltrate stormwater runoff before overflow into an underground detention system. Project Narrative: Project Factsheet From Morris Beacon Design Address: Logee Street, Woonsocket, RI 02895