Requirements: Six Minimum Control Measures Phase II requirements for regulated small MS4 operators The Phase II Rule requires an operator of a regulated small MS4 to apply for a RIPDES permit. The RIPDES application or NOI must include a Storm Water Management Program Plan (SWMPP) that describes the Best Management Practices (BMPs) for each of the following six minimum measures: Public Education and Outreach Public Involvement/Participation Illicit Discharge Detection and Elimination Construction Site Runoff Control Post Construction Runoff Control Pollution Prevention/Good Housekeeping The SWMPP must contain the measurable goals for each minimum control measure (narrative or numeric, used to measure the success of the program) as well as an implementation schedule including interim milestones and frequency of activities and reporting of results. The Director can also require additional permit requirements based on the recommendations of a Total Maximum Daily Load (TMDL). For more information on TMDLs, visit the Office of Water Resources TMDL Program site. Additional Resources Stormwater Regulation Glossary EPA Stormwater Homepage EPA National Menu of Stormwater Best Management Practices EPA Storm Water Phase II Compliance Assistance Guide (2000) RI Stormwater Solutions RI Snow Disposal Policy